Panasonic NA168VG3 Operations Instructions Page 36

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 35
36 - Installation Instructions
Checking After Installation
Installation checklist
3
2
4
65
7
1
5 6 5 6
5) Adjustable stands
Are they bolted securely to the
appliance?
6) Stand cushions
Are they standing flat?
If the appliance is not level, there may
be abnormal sounds when water is
drained out.
7) Power supply
Is the household dedicated mains
socket, fully rated at AC 220 V to 240 V?
1) Anchor bolts
Have you removed them and attached
the cover caps properly?
2) Location
Is the appliance on a flat, stable
surface?
Does it run without vibrating?
3) Water-supply hose
Is it free from leaks?
Is the water supply normal?
4) Water-drain hose
Is it free from leaks?
Does it drain normally?
NA-168VG3_English.indb 36 2011-3-17 15:10:13
Page view 35
1 2 ... 31 32 33 34 35 36 37 38 39 40

Comments to this Manuals

No comments