Panasonic CU-TE12DKE User Manual Page 45

  • Download
  • Add to my manuals
  • Print
  • Page
    / 80
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 44
11.2.5. CONNECT THE CABLE TO THE
INDOOR UNIT
1. The inside and outside connecting cable can be connected
without removing the front grille.
2. Connecting cable between indoor unit and outdoor unit
shall be approved polychloroprene sheathed 4 × 1.5 mm
2
flexible cord, type designation 245 IEC 57 (H05RN-F) or
heavier cord.
Ensure the color of wires of outdoor unit and the
terminal Nos. are the same to the indoor’s respectively.
Earth lead wire shall be longer than the other lead wires
as shown in the figure for the electrical safety in case of
the slipping out of the cord from the anchorage.
Secure the cable onto the control board with the holder
(clamper).
INSTALLATION OF SUPER ALLERU-BUSTER FILTER
1. Open the front panel.
2. Remove the air filters.
3. Put Super Alleru-buster filter into place as shown in
illustration below.
HOW TO TAKE OUT FRONT GRILLE
Please follow the steps below to take out front grille if
necessary such as when servicing.
1. Set the vertical airflow direction louver to the horizontal
position.
2. Slide down the two caps on the front grille as shown in the
illustration below, and then remove the two mounting
screws.
3. Pull the lower section of the front grille towards you to
remove the front grille.
Caution
When reinstalling the front grille, first set the vertical
airflow direction louver to the horizontal position and
then carry out above steps 2 - 3 in the reverse order.
AUTO SWITCH OPERATION
The below operations will be performed by pressing the
“AUTO” switch.
1. AUTO OPERATION MODE
The Auto operation will be activated immediately once the
Auto Switch is pressed.
2. TEST RUN OPERATION (FOR PUMP DOWN/SERVICING
PURPOSE)
The Test Run operation will be activated if the Auto Switch
is pressed continuously for more than 5 sec. to below 8 sec.
A “pep” sound will occur at the fifth sec., in order to identify
the starting of Test Run operation.
45
CS-TE9DKE CU-TE9DKE / CS-TE12DKE CU-TE12DKE
Page view 44
1 2 ... 40 41 42 43 44 45 46 47 48 49 50 ... 79 80

Comments to this Manuals

No comments